UK CDM Paperwork: 3 Core Documents That Work on Site
Every UK construction project requires specific CDM documentation. Learn how to manage your construction phase plan and health and safety file to ensure site compliance.
By James Shorter ·
Insights, tips and news for UK construction teams running projects on BRCKS.
Every UK construction project requires specific CDM documentation. Learn how to manage your construction phase plan and health and safety file to ensure site compliance.
By James Shorter ·
Avoid weeks of delay by mastering the UK client sign-off process. This guide maps CDM and Building Regulations duties to a compact evidence pack checklist.
By James Shorter ·
Discover how to transform WhatsApp from a liability into a structured capture tool for UK construction projects while maintaining a compliant audit trail.
By James Shorter ·
Discover how to implement a robust drawing version control system to comply with golden thread guidance and prevent costly site errors and disputes.
By James Shorter ·
Learn how to centralise project communication and reduce disputes using these 10 essential client portal best practices tailored for the UK construction industry.
By James Shorter ·
Navigate the complexities of RIBA Stage 6 handover with a practical checklist designed to secure completion certificates and manage the defects liability period effectively.
By James Shorter ·
Protect your project margins with a professional variation log template. Learn the essential columns and rules to ensure every instructed change is authorised and paid.
By James Shorter ·
Master the S-curve to turn static budgets into early-warning systems. This guide covers WBS alignment, Excel setup, and a worked six-period example for UK builders.
By James Shorter ·
Free UK site diary template for builders: labour, plant, weather, deliveries, visitors and instructions in 11 fields. Download it, or keep it on your phone.
By James Shorter ·
Discover how to turn site photos into admissible evidence. This guide covers essential hold points, metadata preservation, and automated workflows to eliminate rework.
By James Shorter ·
Learn how to build a reliable 4–6 week lookahead plan that actually holds, ensuring your site supervisors can manage constraints and trade coordination effectively.
By James Shorter ·
Learn how to produce evidence-backed construction progress reports that withstand NEC4 scrutiny and protect your commercial position using structured site records.
By James Shorter ·